
Marudi Junction 275kV
March 24, 2018
Marudi Junction 275kV substation is located in between Miri, Lambir to Bekenu Town and this substation is the junction points of Miri Region to Marudi Town. It serve as one of the most important substation at the Northern Region which connected with Transmission Line between Tudan 275kV to Similajau 275kV. The substation was completed and successful energized on 25th March 2018 and shown that 1World Real Power Sdn Bhd had completed the jobs well with the Main Contractor L&T.

Deshon 132kV (Extension) Substation
February 23, 2023
Deshon 132kV Substation is situated at Sibu region and it is the existing 275kV/33kV substation which needed extension to support the rapid development at Sibu, so to continuously to supply power electricity for Sibu Town. Once again, collaboration between SEE Engineering Sdn Bhd and 1World Real power Sdn Bhd has success the project and hand over to Sarawak Energy Berhad.

Stakan 132kV Substation
May 27, 2023
Stakan 132kV substation is located at Kuching Region and the location itself is very unique as this substation have 3 Major Transmission Line connected to it, which is Mambong 275kV, Semenggok 132kV, and Entinggan 275kV transmission line. This project consider is the first project for 1World Real Power Sdn Bhd from SEE Engineering Sdn Bhd.
â—„
1 / 1
â–º




